How Buildway Designs, Fabricates, and Constructs Your Steel Buildings: Our Step-by-Step Process

Your Project Journey

Step 1
Step 1

Personalized Consultation: Our building specialist works closely with you to design your steel building, discussing the ideal size, location, accessories, and specifications. After this, you receive a customized quote that aligns perfectly with your vision and requirements.

Step 2

Seamless Approval Process: Once you approve the quotation, we formalize it into a purchase order via Adobe Sign. An initial deposit kicks off the creation of your detailed engineering drawings, a process that usually takes between 3 to 12 weeks depending on the complexity

Step 3

Precise Production & Quality Control: As we get your drawing approvals, your building enters production. Our team prioritizes precision and quality, ensuring every steel component and detail meets the highest standards. Before delivery, we confirm your readiness to receive the shipment.

Step 4

Timely Delivery & Support: We notify you of your building’s delivery window well in advance. While offloading is typically managed by you, our team is ready to assist, guiding you through the final steps to get your building set up smoothly.

Join the Many Satisfied Buildway Clients

Client Testimonials

Have more questions?

FAQ’s

We’re here to help!

Whether it’s about our pre-engineered steel building kits, prefab metal structures, or customization options, Buildway is ready to provide the answers you need. Our expert team guides you through every step ensuring a smooth and confident building experience.
Can Buildway accommodate changes or upgrades after my building process begins?

Buildway gives you flexibility to make changes during design and early production, before fabrication begins. For upgrades later on, our team can advise on the best options and help with future expansions or retrofits to fit your evolving needs.

Once you approve your quote, we’ll move forward with a simple, secure digital contract. After your deposit, our team creates detailed engineering drawings to bring your project to life. The process typically takes 1-2 days after design completion.

Yes. During the design stage, you can choose everything from size and color to doors, windows, insulation, and structural features. We’ll make sure all your choices are clearly included in your quote and drawings before moving on to production.

At Buildway, we prioritize accuracy and quality at every stage of manufacturing. Each steel component is made as per your approved drawings, with our team performing detailed checks along the way. Before shipping, we make sure your building is complete and perfectly aligned with your plans.

Buildway coordinates delivery and keeps you informed with a clear arrival window. While unloading and setup are usually handled by the client, our team is here to guide and support you, ensuring your building arrives safely and installation goes smoothly.

Absolutely. Buildway’s customer service team stays available throughout and beyond the delivery phase. Whether you have questions about installation, maintenance, or future expansion, you can contact Buildway for prompt and expert support.